About this
project
Main Contractor: Kier Construction
Client: Warwick District Council
Steane completed the design and install for the £22m redevelopment of the existing swimming pool building in a medieval monastic archiological grounds of a former Abbey of Kenilworth.
The new bulding features a 15m family swimming pool and a 25m main swimming pool, changing area, both internal and external toilets, Cafe area and Terrace.
Steane were proud to collect the Kier Midland Sub Contractor of the Year (£1m+) Award 2026.
Some more detail
Our package included:
- Mains and Submain Distribution
- Cabling and Containment
- Earthing and Bonding
- General Lighting
- Emergency Lighting
- Small Power
- Voice and Data
- Pool Alarms
- Public Address System
- Fire Detection, Alarm and Refuge
- Induction Loops
- CCTV/Security System
- Lightning Protection