Abbey Fields Swimming Pool

About this
project

Main Contractor: Kier Construction
Client: Warwick District Council

Steane completed the design and install for the £22m redevelopment of the existing swimming pool building in a medieval monastic archiological grounds of a former Abbey of Kenilworth.

The new bulding features a 15m family swimming pool and a 25m main swimming pool, changing area, both internal and external toilets, Cafe area and Terrace.

Steane were proud to collect the Kier Midland Sub Contractor of the Year (£1m+) Award 2026.

Some more detail

Our package included:

  • Mains and Submain Distribution
  • Cabling and Containment
  • Earthing and Bonding
  • General Lighting
  • Emergency Lighting
  • Small Power
  • Voice and Data
  • Pool Alarms
  • Public Address System
  • Fire Detection, Alarm and Refuge
  • Induction Loops
  • CCTV/Security System
  • Lightning Protection

Other clients

Other sectors