James Cond  Construction College

About this
project

Main Contractor:   GMI Construction
Client:  University College Birmingham

Situated in the Jewellery Quarter of Birmingham, this former print works site is now a  Construction College providing specialist courses in sustainable methods of construction and green technologies.

Steane completed the M&E design from Stage 4 and carried out the M&E for the refurbishment of this old building with an emphasis on renewable technology to meet its high energy efficiency rating.

Air source heat pumps, compressed air and natural ventilation systems were installed and managed by a BMS system. Photovoltaics and specialist lighting systems all contributed to achieve this.

Completed in September 2023.

Some more detail

 Electrical

  • Specialist Lighting and emergency lighting systems.
  • Lighting Control.
  • Call Systems
  • Emergency voice communication systems
  • Energy metering
  • Voice and data
  • Access Control
  • Intruder and Hold up Systems
  • CCTV
  • Fire Alarm
  • Lightning Protection
  • Audio frequency induction loop systems
  • 24.60 Kwp Photovoltaic system

Mechanical

  • Air Conditioning
  • Air Source Heat Pumps
  • Ventilation
  • CAT 5 Water B
  • Domestic Water
  • Drainage
  • Controls/BMS system
  • Specialist gases – compressed Air
  • LEV Extract

Other clients

Other sectors