Fabrick Square

About this
project

Main Contractor: Colmore Tang Construction
Client: Seven Capital Group

Steane was awarded the Mechanical and Electrical Design and Build contract for this £30m project. The former Harrison Drape curtain factory and office building was redeveloped into 313 high spec apartments (73 studios, 152 one bedroom and 88 two bedroom flats) with the construction of two new floors alongside a retail unit, parking and landscaping.

We are also working on a similar apartment project for Colmore Tang in the Jewellery quarter of Birmingham, where the former Swan Manufacturer building is being redeveloped after being vacant for ten years.

Some more detail

  • Fully integrated M&E Design
  • A mixture of electric and gas central heating,
  • Domestic water services
  • Ventilation
  • Lighting,
  • Distribution and containment
  • Cabling and Wiring
  • Small power
  • Smoke extract system
  • CCTV
  • Door access systems